Which are the planning, design, building,and implementation phases considered to be

Respuesta :

obzooaz
obzooaz obzooaz
  • 03-12-2020

Answer:

Whether you're in charge of developing a website, designing a car, moving a department to a new facility, updating an information system, or just about any other project (large or small), you'll go through the same four phases of project management: planning, build-up, implementation, and closeout.

Explanation:

Answer Link

Otras preguntas

Riverbed company purchased a delivery truck for $33,000 on January 1, 2022 the truck has an expected salvage value of 2760 and he suspected to be driven 108,000
evaluate the expression: 7 - 3 + 9 x 8 ÷ 2
Any change in the air's ________ content could alter temperatures in the lower atmosphere.
When exiting the expressway, signal your intention to exit approximately _____mile before you exit
1) What does Hawking say is a valid observation, and what should observation do?
Diabetes, a recessive trait, occurs in 10% of a certain population. What is the proper letter used as a symbol for the gene concerned? If a normal female and a
Determine which of the following graphs does not represent a function.
What is the following quotient? √120 divided by √30 02 4 O 2√10 O 3√10
ASAP help me with this
Solve by graphing. tan(30x - 90°) = -x³