When multiple architects work on a construction plan, which section of a construction plan will help them keep track of when the changes are made and by whom?
A.
framing plan
B.
schedule
C.
title block
D.
bill of materials

Respuesta :

katusukibakugoisgod
katusukibakugoisgod katusukibakugoisgod
  • 07-12-2020

Answer:

I believe that it is . A. framing plan

Explanation:

But I am not certain But I do know that it IS NOT B..

Answer Link
ewachi101 ewachi101
  • 26-08-2021

Answer:

the answer is schedule!!!

Explanation:

Answer Link

Otras preguntas

If KL = x + 4, LM = 2, and KM = 5x − 3, what is KL?
Money is borrowed at ​8% simple interest. After one​ year, ​999.00$ pays off the loan. How much was originally​ borrowed?
What was the most significant factor that contributed to the Fall of the Roman Empire? Make a list of at least four factors that contributed to the fall of Rome
Segment AB has a midpoint M. If A is located at (4, 2) and M is located at (7, -3), what are the coordinated of B?
what kind of religion did the aztecs practice
The way an engine works has never been understood by David
Josie burned herself in the kitchen and is fairly certain that it is only a first-degree burn because it only involves the top layer of her skin. How should J
What is the splitting part of one cell to form to a new cell called???
A toy box is 3 feet wide, 4 feet long, and 2 feet tall. What is the volume of the toy box?
The following are characteristics of a Gregorian Chant, exceptA. plainsongC. used neumesB. Free TempoD. polyphonic texture