medm0om5iebernan medm0om5iebernan
  • 01-11-2016
  • Mathematics
contestada

A construction company delivered 40 loads of concrete in 5 days.

What was their rate of work?



A.




B.




C.




D.


Respuesta :

melhunt99
melhunt99 melhunt99
  • 05-11-2016
Well 40 divided by 5 is 8 and you don't have options so I would say 8 loads a day :)
Answer Link

Otras preguntas

This number is 0.02 more than 5 and 5 tenths
Which is equal to 42 • 48? a. 416 b. 410 c. 46 d. 4−6
The point-slope form of the equation of the line that passes through (–4, –3) and (12, 1) is y – 1 = (x – 12). What is the standard form of the equation for thi
David and Sue are playing a card game. David’s score is –12. David’s and Sue’s scores differ by 7 points. Which expressions could represent Sue’s score? Choose
During the Age of Absolutism (1600s and 1700s). European monarchies sought to a. Increase human rights for their citizensThis answer is incorrect. b. Encourage
The Mycenaeans were located in this country.
To ensure security, passwords should be A. a combination of letters and numbers. B. hard for you to remember. C. kept near the main computer. D. less than six
Which of the following would be considered an example of a human resource? A. climate changes B. industrial resources C. intellectual contributions D. natural r
what was not an outcome of the meiji restoration in japan
write an equation where 45 is the product