If 24 electricians can wire some new houses in 15 days, how many electricians would be required to do the job in 12 days?.

Respuesta :

shishirshrestha989
shishirshrestha989 shishirshrestha989
  • 04-01-2022

Answer:

here,

electrician/days

24 - 15

x(let). -12

direct proportion,

then,

exchange X up 24 down

or,24*15=12*X

or,24*15divided by 12=X

X=30

hence,30 electrician required to do complete in 12 days

Answer Link

Otras preguntas

Is Yakutsk Russia or Anchorage Alaska closer to the ocean
completing the square v^2 + 4v - 22= 10
A bucket filled w sand has a mass of 11.15 kg. when it is filled with water, the mass is 5.95 kg the mass of the sand is twice that of the water. Find the mass
Three times the square of a number if five less than sixteen times the number. What is the number?
Lauren has a ribbon that is 1/2 yard long. She cuts the ribbon into 5 pieces of equal lengths. How long us each piece of ribbon? 10, 1/10, 50 or 1/5?
How are ratios used in everyday life?
what times what equals to 810
What were the important battles in the War for Texas Independence? Why was each important?
The The geometrics decide to play a concert in the gym. The gym measures 100 feet long by 60 feet wide by 30 feet tall. The band asks the stage crew how loud th
Under what conditions does the "NET FORCE" acting an object equal the sum of the individual forces? Net Force- Acting on an Object Is my definition right?