mparrish2965 mparrish2965
  • 03-07-2022
  • Engineering
contestada

A feature control frame must be connected to

Respuesta :

tcs1257621
tcs1257621 tcs1257621
  • 03-07-2022

Answer:

Surface Parallelism When a surface is to be parallel to a datum plane, the feature control frame is connected by a leader to the surface, or to an extension line from the surface.

Explanation:

Answer Link

Otras preguntas

can you have a fraction in this?
Who was the first 3 people to walk on the moon? please help
which statement is supported by the results of rutherford's gold foil experiment A.Negative and postive charges spread evenly though out an atom B.there are den
Write a letter of about 100 words to a family member, taking the point of view of a freed slave, a Northerner, or a Southerner. Express your feelings about Reco
What is the answer to the problem
2x + 5y = 34 x + 2y = 14 A. x = -26, y = 20 B. x = 2, y = 6 C. x = 3, y = 5.5 D. x = 10, y = 2
Which of the following criteria makes someone eligible to run for president of the United States?
how to resolve this problem.
What can regulate the function of a gene?
kyle models a sum of two integers. he uses more negative (red) counters than postive (yellow) counters. what do you predict about the sign of the sum? *explain