Beverly7520 Beverly7520
  • 01-03-2018
  • Social Studies
contestada

In the lean principles philosophy, unexpected downtime is the result of unreliable processes.

a. True

b. False

Respuesta :

Grace0424
Grace0424 Grace0424
  • 01-03-2018
I thinks the answer is true
Answer Link

Otras preguntas

como puedes saber con anticipacion el numero de cifras decimales que lleva el resultado de multiplicar un numero natural por un decimal
Bainbridge sells 285 Twinkies aday from her roadside standHow many Twinkies does shesell in 57 days?​
Ratios Analyzing Long-Term Firm Solvency The following information is available for Banner Company: Annual Data 201
For $300,000, Willis agrees to build a new home for Robert, who is very picky. Willis builds the home to Robert's specifications with one exception. The faucets
Solve the equation using the distributive property and properties of equality. -5(a+3) --55 What is the value of a? 0-14 0-8 08 0 14
Choose the correct item.
Which is the least viscous? A C20H42 B. CCL4 C. CH3OH D. CHCI3 E. C6H6
Please select the word from the list that best fits the definition an explanation of facts using experiments A. Hypothesis B. Rationalism C. Scientific Meth
The temperature at 7 a.m. was -11°C. The temperature increased by 9°C during the day and then decreased by 4°C at 8 p.m. Which was the temperature at 8 p.m.?
Write the quadratic equation in standard form: -7x + x2 = - 3x2 + 6 pleaseee i need help!!